This page has been developed in an effort to both educate you about the role of your home owner's association and to assist you with your home improvement ideas. Please read all of your community documents linked at the bottom of the homepage before starting any exterior project.
*IMPORTANT*
Approval Required: no exterior changes should begin until approval from the HOA has been provided. Please read Article IX, X and XI (pages 21-28) of the legal covenants for more specifics on architectural control.
Project Details: All applications should include competently developed drawings to reflect plans, elevations, construction details, etc. as necessary to fully describe the proposed project.
Response Time: The HOA has 30 days to render a decision. Note - the 30 timeline for an official response does not begin until all of the required details have been received by the HOA.
How can you speed up the process? Submit as many details as possible. Such as, specifications of all materials, finishes, exterior colors, size, location etc. Drawings on a plot map are preferred to reflect the location of the proposed change in relation to your property lines. Use the Wake County iMaps site to obtain a copy of your plot map here: plot map search.